At IFFCO, we do not see industry and the environment in adversarial positions. There are inherent challenges that need to be addressed, but we believe that a holistic approach and responsible informed choices can lead to solutions that are sustainable.

IFFCO is integrating environmental protection across all its operational activities. Through optimal utilisation of energy sources, eliminating waste and wastage, adopting greener processes, developing greener products, adherence to best practices and compliance with emerging international standards, we are ensuring that along with a robust business performance, our environment too remains in good health.

We conduct periodic EHS training for our workforce to foster environmental awareness and responsibility and thereby embed environmental stewardship within our business culture. We reinforce the behaviour by setting and regularly reviewing our environmental objectives and targets.

The management of each plant or facility with its comprehensive policies on quality, environment, health and safety, is accountable for its environmental impact. At IFFCO plants and offices, the respective managers are responsible for ensuring optimal consumption of material and energy. We also work closely with our clients, suppliers, and various external stakeholders to improve environmental performance.


Various Schemes to mitigate Green House Gas Emission in IFFCO’s operation are being implemented by all the plants, HO, RED, Marketing Offices etc. These include:
(i) Roof Top Solar Power Plants installed at IFFCO colony Gurgaon (5 KWp), Kalol (10 KWp), Paradeep (5 x 2 KWp), Phulpur (5 KWp )
(ii) Solar Water Heating Systems ( 1×500 LPD & 6×300 LPD at Kandla, 30x 200 LPD & 150 x 100 LPD at Gurgaon, 34×300 LPD at Paradeep)
(iii) LED Lights & Fixture (626 Nos. LED Fixture & 600 LED Tube Light at Kalol, 931 Nos. LED+ 100 Nos. CFL at Kandla, 200×20 W LED Tube at Phulpur, 40 Nos. Paradeep, 1000 LED Tube Light at Gurgaon)
(iv) VFD Starter Panels for Fan & Blowers at Kandla
(v) Light Pipes at Kandla (30 Nos.), Phulpur ( 6 Nos.), Kalol & Paradeep
(vi) Solar Pump at Unnao
(vii) Rain water Harvesting System (2 Nos.) at Phulpur
(viii) Induction Light (50 Nos. at Kalol, 350 Nos. 350 Nos. at Kandla, 30 Nos. at Phulpur, 200 Nos. at Paradeep)
(ix) 180 Nos. Energy Efficient Ceiling Fan for Township at Kalol (pay back 3 years)
(x) 50 Nos. Occupancy Sensor at Phulpur Unit
(xi) Green building Certification of IFFCO Sadan, Sect-29 & Sect.32 Building at Gurgaon ant IFFCO Building at Chandigarh
(xii) BMS upgradation at IFFCO Sadan,Sect.29 Gurgaon
(xiii) Heat Reflection Paint at IFFCO Sadan & IFFCO Tower
(xiv) Financial assistance was provided for installation of Solar Street Light (145 nos), Bio Gas Plants(13 nos), Solar panels (50 nos) etc. at various IFFCO adopted villages.
(xv) Energy Saving Lighting Fixtures for street light, office areas and plant building at Kandla
(xvi) Solar Water Heaters at Township and Light pipes at plant buildings at Kandla